Delivery, installation, and commissioning of a complete solar-powered water pumping system at the existing water well (borehole) located at at Zamra river, Mearenet Kebele (3.5km Far from Nuraq town-Capital of the Woreda), Abergele Woreda of Wag-Himra Zon